Floral Park-Bellerose/John Lewis Childs - 10/26

  • Floral Park-Bellerose

    • Foundation walls being formed
    • New foundation walls being poured
    • Newly poured foundation walls

    John Lewis Childs

    • Backfilling and compacting interior of footprint
    • Conduit for electricty being installed underground for new addition
    • Conduit for electricty penetrating new foundation walls for new service
    • New foundation walls 
    • New underground plumbing for new addition
    • Waterproofing on new foundation walls

FPBS - JLCS

  • Floral Park-Bellerose/John Lewis Childs Drone Photos - 10/7

     

Construction Photos - 7-17-2020

  • JLCS

    • JLCS footings – concrete being poured

Construction Photos - 6-30-2020

  • JLCS

    • Excavating for JLCS addition foundation, and establishing rough grade for basement level of addition

     

Floral Park-Bellerose/John Lewis Childs - 6/10

  • Floral Park-Bellerose/John Lewis Childs - 6/10

    JLCS

    • Excavation and installation  for main sanitary line
    • Removal of abandoned drainage pool

    FPBS

    • Excavation and installation for drainage pools

Floral Park-Bellerose/John Lewis Childs - 6/9

  • Floral Park-Bellerose/John Lewis Childs - 6/9

John Lewis Childs - 6/4

  • John Lewis Childs - 6/4

Construction Photos - 6-1-2020

  • John Lewis Childs- 6/1

Construction Photos - 5-28-2020

  • Floral Park-Bellerose- 5/28

    • Continued field stripping operations and stockpiling fill.
    • Delivered additional drainage rings and concrete collars for drywells on site.
    • Continued excavation operations for drywell installation.
    • Placed geotextile fabric on new drywell rings. Completed the installation of (3) drainage pools and backfilled.

Construction Photos - 5-27-2020

  • Floral Park-Bellerose- 5/27

    • Completed field mark out on site for building foot print and proposed roadway.
    • Continued field stripping operations.
    • Graded sub base for proposed asphalt roadway.
    • Continued excavation operations for drywell installation.
    • Placed geotextile fabric on new drywell rings. Completed the installation of (3) drainage pools and backfilled.

Construction Photos - 5-22-2020

  • Floral Park-Bellerose- 5/22

    • Mobilizing on site at FPB.
    • Completed field mark out on site.
    • Began field stripping operations.
    • Graded sub base for proposed asphalt roadway.
    • Compiled stripped top soil and fill on site. 
    • Installed barriers over irrigation boxes.

Construction Photos - 5-21-2020

  • John Lewis Childs - 5/21

    • Connected and tied in 12” discharge drainage piping.
    • Set and installed concrete collar extensions above dry wells. 
    • Backfilled around dry wells.
    • Backfilled and graded subgrade surrounding dry wells.
    • Installed dry well covers.
    • Graded RCA sub base.